SMT Machine Installation

SMT Machine InstallationSMT Machine InstallationSMT Machine Installation

SMT Machine Installation

SMT Machine InstallationSMT Machine InstallationSMT Machine Installation
  • Home
  • SERVICES
  • COMPANY PROFILE
  • More
    • Home
    • SERVICES
    • COMPANY PROFILE
  • Sign In
  • Create Account

  • Bookings
  • My Account
  • Signed in as:

  • filler@godaddy.com


  • Bookings
  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • SERVICES
  • COMPANY PROFILE

Account

  • Bookings
  • My Account
  • Sign out

  • Sign In
  • Bookings
  • My Account

SERVICES

SELECT FROM THE BELOW SERVICES
SMT NEW MACHINE PURCHASESMT MACHINE INSTALLATION IN DELHI NCRSMT SPARE PURCHASESMT PROCESS CONSULTATION

SMT NEW MACHINE PURCHASE

Defining Requirement

We first understand the product mix (LED, Automotive, consumer, Telecom) & study the board size range, component types (0402, 0201, BGA, QFN) , monthly volume (current & 2 yr-projections), changeover frequency & then check for required CPH, accuracy class & Line Configurations (1 vs. Multi Mounters)

Line Configuration planning

Then we decide on the line configuration keeping in view the nature of AOI required (Inline vs Semi/Auto), future expansion space & conveyor compatibility.

Vendor Shortlisting

Once line configuration is decided, then we proceed for selection of Equipment vendor who can provide us as per our requirement. Further evaluation criteria depend on installed base in India, spare part availability, Local service team strength, Response time (actual), software usability. 

Technical Evaluation

Next we perform live demonstration of customer PCB.  We check feeder compatibility, software program compatibility & changeover time demonstration. Here we measure Actual vs Claimed CPH & placement accuracy on fine pitch

Commercial Negotiation

Here we perform breakdown analysis of pricing offered by vendor into Machine cost, Installation & Training cost, Spare cost, Warranty (Min 1 year), AMC after warranty. Here we negotiate on free initial spare kit, 2~3 visits free after installation & payment terms.

Site Preparation

This phase is most critical before machine arrival. Here we ensure site is ready for machine installation w.r.t power, air, environment & layout

Machine delivery & Installation

Ensuring Machine is delivered, moved to the production floor & installed on the line .  Need to check for machine levelling, air & electrical connections & software set-up. 

Calibration & Trial run

Here we dry run the machine without pcb &  make a sample PCB. We check fiducial recognition, nozzle condition, placement offsets & feeder performance during this stage. We fine tune for pick up height, placement force & vision alignment. 

SMT MACHINE INSTALLATION IN DELHI NC

Defining

First of all we verify the packing list against the actual items delivered by the supplier. Machine specs are verified as per ordered & received along with machine accessories like feeders, nozzles, cables & manuals.

Site Readiness Validation

Before machine opening, we first verify power, air, environment & space for starting machine placing activity on line. When all of the above factors are verified, then we proceed further.

Machine Positioning

We move the machines to the line using pallet truck & place as per approved line layout. In case of new line set-up, first we start with Mounter placement on line & then align other upstream & downstream equipment accordingly.

Levelling & Anchoring

We use precision levelling tools & adjust machine legs properly. We believe levelling is first & foremost important part of new line installation & has a high impact on overall Machine performance during Production.

Electrical Connections

Now, we connect the mains & check phase sequence & voltage stability. Along with this Air & other machine to machine connections are also connected.

Software set-up & Machine homing

Once connections are done, power ON the machines, verify the Machine software & performing axis homing to verify all machines are ready to operate in Auto Mode during Production.

SMT SPARE PURCHASE

Fast & reliable SMT Spare parts supply across India

We are proud to say that we have one of the best delivery speeds for SMT Spare part across India to reduce overall Machine downtime. We deal in Nozzles, feeders, filters & sensors. We work on same day dispatch, Pan-India support, OEM & compatible parts along with

Technical support.

Diversified Product Category

We deal in all kinds of spare parts starting from Pick & Place, Feeder parts, Printer consumables, Reflow Oven parts, AOI parts etc.

Custom Spare kits

We deal in individual spare parts along with custom spare kits , monthly consumption kit.  Sometimes buying these kits gives you much better deal compared to individual parts

Serving Multi product segment

We deeply understand Indian Electronics manufacturing eco-system & cater to their specific needs whether it be EMS companies, LED manufacturers, Automotive electronics or consumer electronics.

Emergency support

We understand the urgency of supply chains delivering to vast & diversified Indian market. For this we have an emergency phone line which will ensure the part is delivered in the fastest time possible

SMT Brands supported

We have after sales support for many SMT brands  namely Yamaha, Fuji, Juki, Hanwha & Panasonic & continue to follow market trends & update our brand portfolio accordingly.  

SMT PROCESS CONSULTATION

Practical on-site & remote support to optimize SMT line performance

Our expert team specializes in providing on-site & remote support to all your SMT process  problems like frequent placement defects/rejections, High machine downtime, poor first pass yield, process set-up for new product etc.

Consultation services offered

Core consultation services we offer are SMT line set-up & optimization, New Product process development (NPI support), Placement accuracy improvement, Reflow Profile optimization, stencil & printing process improvement, Feeder & component handling optimization, Spare part planning & consumption control  

Measurable Outcomes

We deliver measurable results after providing these services in terms of reduction in Overall Rejection by 20~40%, Improve FPY (5~10%), reduce downtime, faster changeover time, stable production for new products. We understand that numbers ~ trust in KPI management.

Structure Approach

We follow a structure approach for problem solving which starts from Line assessment (Machine condition, process gaps, operator practices) , Problem Identification (Root cause analysis, data based findings), Implementation (Parameter Optimization, Process corrections, Training), Stabilization (Trial runs, Monitoring, Final handover).  

Copyright © 2026 SMT Installation - All Rights Reserved.


Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept